【unique official website】
Hotline:0511-88209986
Your location: Home >News >FAQ

Consultation hotline

0511-88209986

The ladder edge of the ca吃下ble tray is a kind of stepped ca飛小ble tray

Author:Click:781 Time:2020-09-09

Double ladder side long-span新房 bridge is a kind of ste腦筆pped cable bridge. T師見he load of double ladder side long-span還湖 bridge is much larger than 拿窗that of ordinary cab請知le bridge. Because the stepped cable b快綠ridge depends on the stress 明近and bearing of ladder side,友黑 the stress point and stress a動樹rea of double ladder side農你 increase, so the lo了山ad also increases accordingly.

The double ladder side l事家ong-span cable bridge not only has 兒機strong bearing capacity, b雪冷ut also is strong and durable 湖畫and easy to install. It is assemble購低d from pultruded FRP profiles. I短技ts specific gravity 家新is much lighter than that of carbon s什務teel. There is no need for hot們樹 work during construction, which i體問s safe and environmentally f錯慢riendly.


【【Recommend】】

copyright ©  Jia購習ngsu Hongqiang Electric Group Co.,年購 Ltd 

苏ICP备12034941号